WEEK 1 CRIT
22-2-2016 (MON)
Ar SY/Pn. S:
General Briefing
1. Low energy building.
2. Required for final: Sectional Model 1:20 showing roof, wall and doors & windows.
3. There will be 4 times assessment.
4. Design to be confirmed by week 1-week 3.
5. UBBL schedule 6, 9 and 10.
6. Try revit.
7. Identify a place to cut a detailed section study.
Ar. SY
Comments
1. Do a GrabTaxi Gallery or Info Center because it is too big to have an office in this center.
- Done studies on existing office but agree to setup gallery.
2. Sterile. (Lacking in imagination, creativity, or excitement; uninspiring or unproductive)
- Noted. To finalise my overall design before proceed with detail interior studies and creative office space.
3. Check gradient for fire appliances. - Checked 1:15 for access required. 1:8.3 for access road.
4. Revise boom gate location to be more friendly to the users. -Noted.
5. Central and pleasant prayer room. -Noted.
6. Potential to create stack effect. -Agree and noted.
7. To create a guard house. -Agree and noted.
8. Create riders parking.
9. Create a warehouse tower. - Don't agree to create a lot of offices that required warehouse. Identified two tech companies. Tower for form and contextual response, yes.
10. Categorise and re-identify achor tenants. -Agree. Remove the 5 tenants identified earlier and replaced with the tenants into 2 categories: mobile internet without logistic and mobile internet with logistic service.
11. 7-8 floors development.
12. Space for delivery cars and trucks.
Action:
% of space study to after confirming the basic design.